only for 2childs splits
with "worse case heuristic" means each child is considered to have a cost linear on the number of leafs
no termination criteria
number of BB test/hits expected to "reduced" by some factor
tree building is also expected to be slower as previous split was "object mean", which is quite fast to evaluate